PRE CHRISTMAS WORK
-Tackle worn areas around bunkers (in Progress)
-Commence overseeing trial on fairways (complete)
-Overseed approaches (completed 3 times)
-Tee scarification (in Progress)
-Install 3X Hydrowick Greens Drainage Systems
-14th Hole Greenside bunkers bring to spec with Liners and China Clay sand
-15th Hole X2 New bunkers Front Right of Green
-7 Pine Trees to the right of 15th Green to be removed
-4th Hole Greenside bunkers X2 reduce and Bring up to Spec
-14th Tee steps renew
-13th Tee steps renew
-X2 Astro turf mats installed on 11th and 14th Tees
-12th Tee pathway renovation
POST CHRISTMAS WORK
- Remove pine trees Left 15th Green
- Remove pine trees Left 4th Green-16th tee area
- Remove/thin out trees Left 12th Green
- Earthquake Fairways (aeration)
-Tackle Ends of pathways
- Carry out full prune of course to tackle all low hanging branches
POSSIBLE WORKS (IF TIME ALLOWS)
-Thin out trees right 4th Fairway
-Thin out trees behind 3rd Green/17th tee area